Twenty checks that decide whether a UK construction bid loses marks it did not need to lose. Answer each one honestly about the tender you are working on now. Nothing is stored and no sign-up is required — the scorecard runs entirely in your browser.
Every scored question in the ITT has an assigned owner and a drafted answer.
Unassigned questions are the single most common cause of an incomplete submission.
You meet every stated pass/fail requirement (turnover, insurance, accreditations, experience).
A failed selection requirement voids the bid regardless of quality score.
Word or page limits are recorded per question and every answer is inside them.
Text beyond a stated limit is normally disregarded by evaluators.
All requested attachments, certificates and templates are collected in submission format.
Portals reject late or wrongly formatted attachments without discretion.
Each answer names specific projects, clients, dates and outcomes rather than capability claims.
Named, dated evidence separates upper-band answers from generic ones.
Numbers in your answers are verifiable from records you could produce if asked.
Unverifiable figures are a risk if the buyer clarifies or audits.
Named personnel have CVs, current roles and confirmed availability for this contract.
Evaluators check whether the team offered is the team available.
Every commitment in the answer has a named owner and a delivery mechanism.
Commitments without an owner read as aspiration, not method.
Your method statement is written for this site and this scope, not reused wholesale.
Site-specific constraints are where marks are won or lost.
The programme reconciles with the method statement and the client's key dates.
Contradictions between programme and narrative are penalised.
Principal risks are identified with named mitigations and residual positions.
Risk answers should show control, not a generic register.
CDM duties, safety management and quality assurance arrangements are set out concretely.
Reference the standard, the process and who signs it off.
Social value commitments are quantified and specific to this contract and locality.
Corporate policy statements score at the bottom of the band range.
Committed measures have been agreed with the delivery team as achievable.
Committed measures are often contractual and tracked as KPIs.
Reporting method and frequency for social value are stated.
Buyers want to know how they will see delivery, not just the promise.
Environmental and carbon commitments align with your published policies and data.
Inconsistency with public reporting is easy for evaluators to spot.
You have modelled how the buyer's stated price formula converts your figure into marks.
Price scoring formulas vary widely and change the optimal position.
Your price reconciles with the resources and durations described in your quality answers.
A cheap price with a resource-heavy method invites a coherence challenge.
Assumptions, exclusions and qualifications are permitted by the ITT and documented.
Unauthorised qualifications can make a tender non-compliant.
An independent reviewer has read the full submission against the published criteria.
A fresh reader against the criteria catches what the author cannot.
0 of 20 answered
The scorecard is a control check, not a prediction. It tests whether your submission is complete, evidenced and internally consistent — the failures that cost marks even when the underlying capability is strong. It cannot tell you whether your price will win, because that depends on the buyer's formula and your competitors.
Work the gap list in order of weighting. A missing pass/fail requirement outranks everything else, then compliance with limits and attachments, then evidence quality on the highest-weighted criteria. Leave stylistic editing until the substance is settled.
It scores twenty practical checks across five areas that UK construction evaluators mark against: compliance and eligibility, evidence quality, method and programme, social value and sustainability, and price and commercial control.
Yes. It runs entirely in your browser, requires no sign-up, and nothing you enter is sent to us or stored.
No. The scorecard tests whether your submission is complete, evidenced and internally consistent — the things that cause avoidable mark loss. Winning also depends on your price, your competitors and the buyer's published weightings.
Yes, though it is written around UK public-works ITTs. Private clients often use lighter documentation, so some compliance checks may not apply.